Worked example

A recent check does not make every number recent

Read three source states from the same saved demo snapshot, then decide what each one tells you.

16 September 2026 snapshot. Not live.Sandbar is a fictional company in Sondola's public demo. This saved example uses its public source records and metric readings. It is not a customer result, a live status page or a sequence of events. Capture started 16 September 2026, 19:59 UTC. The dates below belong to the saved source and metric records.

Four dates to keep separate

Last source check
When the connection was checked. This does not establish that a new business reading arrived.
Data through
The latest date covered by the source data. This is separate from the period of an individual metric.
Metric period
The interval the displayed metric measures. A newer source check does not turn a completed monthly figure into a current-month figure.
Metric as of
The date attached to the metric reading. Read it alongside the reporting period. It does not replace that period.

RevenueCat · 16 September 2026 snapshot

1. A source marked Fresh can show a completed monthly reading

Source recordFresh
Last source check
16 Sep 2026, 09:12 UTC
Data through
15 Sep 2026
MRR$49,590
Source
RevenueCat
Unit
USD
Metric period
1 to 31 Aug 2026
Metric as of
15 Sep 2026

The source check and data-through date are later than the MRR period. Those dates describe different things. The displayed MRR still belongs to its stated period. It is not a month-to-date reading for the month of the check.

What to check next. Compare it with MRR for the same completed period and definition. To judge whether the next reading is late, first establish when that period finishes and when the source is expected to report it.

Meta Ads · 16 September 2026 snapshot

2. An error can coexist with an earlier reading

Source recordConnection error
Last source check
16 Sep 2026, 09:13 UTC
Data through
12 Sep 2026
CAC per payer$50.57
Source
Meta Ads
Unit
USD
Metric period
1 to 31 Aug 2026
Metric as of
12 Sep 2026

The source reports a connection error, while a completed-period CAC reading remains available. A failed check does not turn that historical reading into zero. Its presence also does not prove that newer data has arrived.

What to check next. Inspect the source error and verify access. After it is resolved, check the data-through date and the period of the next required reading before using it in a new comparison.

Stripe · 16 September 2026 snapshot

3. A successful check can still leave no usable data

Source recordNo data received
Last source check
16 Sep 2026, 09:12 UTC
Data through
No data received
Metric reading

No Stripe business reading is supplied in this example. A successful connection check is not a zero-valued metric.

The connection status records a successful check, but the source has no data-through date and its data status is never received. That is why the displayed state is No data received. There is no Stripe business reading here from which to infer zero revenue or zero subscribers.

What to check next. Verify that the intended metric is connected to this source and that the required period contains usable data. Keep the result missing until there is a reading to inspect. A valid zero is a measured result. An absent result is not.

Check the period you actually need

Use the source state to decide what needs investigation. Use the metric's definition, unit and period to decide what the number means. Neither check, on its own, establishes why the business changed.

Source: Sandbar's public demo source records and headline metrics, saved on 16 September 2026. Open the demo to inspect its current presentation, or use the metric-checking reference for your own readings. If a reading is missing or unexpected, follow the setup and troubleshooting guide.

See your company clearly by Monday.

Apply in two minutes. Once you are in, your first numbers arrive minutes after you connect a tool.

Free for qualifying startups. Read-only.